Home / Guides / What should an OKR audit check?

What should an OKR audit check?

Short answerAn OKR audit checks four things: adoption (every team set OKRs, every objective has an owner), alignment (each objective has a parent, no orphans), cadence (key results checked in within the window, no frozen ones), and quality (two to four measurable key results per objective, outcomes not tasks). Run it mid-cycle, not at the end, so you still have time to fix what it finds.
0 to 59 At risk: program decaying 60 to 79 Needs attention 80 to 100 Healthy
The Keel health-score bands. Track the trend across cycles more than the absolute number.

Audit mid-cycle, not at the funeral

An end-of-quarter audit tells you why the program died. A mid-cycle audit lets you save it. Run this in week five or six, while there is still runway to act.

The 12 checks

Adoption

  • Every team has at least one objective this cycle.
  • Every objective has a named owner.
  • Every key result has an owner who can move it.

Alignment

  • Every team and individual objective links to a parent.
  • No orphan objectives that connect to nothing.
  • Company objectives are visible to everyone.

Cadence

  • Every key result was checked in within the last week.
  • No key result has been frozen since kickoff.
  • Confidence scores are moving, not static green.

Quality

  • Every objective has two to four key results.
  • Every key result is a measurable outcome, not a task.
  • Every key result has a baseline and a target.

Turn the checklist into a score

Each check is a percentage across the org: what share of teams pass it. Group them into the four pillars, weight them, and you have a repeatable health score you can track cycle over cycle. That is the job Keel automates, so you run this audit continuously instead of once a quarter by hand. See program health.

By the numbersRun the audit mid-cycle, not at the end. Every one of the twelve checks is countable across the org, so it can run continuously instead of once a quarter by hand.

Frequently asked

How often should you audit OKRs?

Run a light audit mid-cycle, around week five or six, so there is still time to fix what you find. A full read at cycle end is for learning, not saving the quarter.

What are the signs of a failing OKR program?

Teams with no OKRs set, objectives with no parent, key results frozen since kickoff, and static confidence scores. Each one shows up before the quarterly review if you look.

Can you automate an OKR audit?

Yes. Every check is countable across the org, so it can run continuously instead of by hand once a quarter. That continuous audit is what an OKR program-health tool does.

Sources: Andy Grove, High Output Management (Intel, origin of OKRs). John Doerr, Measure What Matters and whatmatters.com. Christina Wodtke, Radical Focus. Felipe Castro on outcomes vs output. Google re:Work OKR guide. Keel market research, July 2026.

Measure this, don't hope for it.

Keel scores your OKR program on all four pillars and shows the teams letting it slip. Request early access.

No spam. We only reach out about early access.